5082Reservoirs and Electrical Energy Production

Institutions that intervene
MARM, basin bodies
Works that will be carried out in the year 2009
Collection of statistical information.
Filtering, recording and processing of the data.
Analysis and interpretation of the data.
Dissemination of the results.
Basin bodies send measured data (dammed volumes and stored energy) every Monday.
Budgetary credits necessary for its finance in the year 2009  (in thousands euros)

400.00


Plan sheet      Plan incidences sheet