5082Reservoirs and Electrical Energy Production

Shown in the Royal Decree of the Plan 2009-2012
Yes
Has continued to be valid in this Plan
Yes
Has changed name during the course of this Plan
No
Annual Programme 2009
5082 Reservoirs and Electrical Energy Production
Annual Programme 2010
5082 Reservoirs and Electrical Energy Production
Annual Programme 2011
5082 Reservoirs and Electrical Energy Production
Annual Programme 2012
5082 Embalses y Producción de Energía Eléctrica
Formed by statistical operations in the ISO


Plan sheet